| Livingston Associates,
P.C. is a leader in water supply development. Listed below is a summary
of various water supply projects. |
|
ASR Hybrid Well
No. 9
Alamogordo,
New Mexico |
| For the City of
Alamogordo's Aquifer Storage and Recovery (ASR) program, Livingston Associates
designed a hybrid well to be used for both injection and pumping. The well
includes specialized "down-hole" injection equipment, vertical turbine
submersible pump, and enclosure. |
 |
Ohkay Casino
Water System
San
Juan, New Mexico |
| Our company designed
the water supply well equipment for a multi-million dollar resort in northern
New Mexico. The project also included a booster pumping station, 250,000
water storage tank and transmission piping. |
 |
Desalination
Feasibility Study
Alamogordo,
New Mexico |
| Livingston Associates
was selected to evaluate the feasibility of using brackish ground water
as a future water supply for Alamogordo, New Mexico and the surrounding
region. Project study components included ground water modeling, desalination
water treatment options, pilot plant operation at various wells in the
area, cost analysis and preliminary designs for a 13 million gallon per
day facility. |
 |
Springer Springs
Diversion Structures
Alamogordo,
New Mexico |
The evaluation and
improvements design of the City of Alamogordo Springer Springs collection
system, was performed by Livingston Associates. The project included 16
spring collection and junction structures, 5,000 feet of 8 inch to 12 inch
pipe and over 1,000 feet of slotted infiltration galleries. |
 |
Springs Rehabilitation
Cloudcroft,
New Mexico |
| We designed improvements
to the Village of Cloudcroft, New Mexico spring collection system which
included rehabilitation of 400 feet of existing galleries, addition of
5 new spring diversion structures and 2,000 feet of waterline. |